Welcome Guest Search | Active Topics | Log In | Register

12 Pages «<7891011>»
Adam's SotS Build Options
pemberg
#161 Posted : 24 November 2016 10:17:28

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
Beautiful job on the paintwork, those lines are really crisp.
Graeme
ian smith
#162 Posted : 28 November 2016 14:53:40

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 16/08/2010
Posts: 2,771
Points: 8,344
Location: Brighton
Hi Adam.
Very nice paint job and great looking planking.
Ian Cool BigGrin
Current builds.Hachettes build the bismark,HMS Victory, HMS Hood.
Finished Builds Corel HMS Victory cross section.
AdamHall
#163 Posted : 12 January 2017 14:37:51

Rank: Semi-Pro Level 2
Build-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 17/04/2014
Posts: 99
Points: 303
Location: Perth, Western Australia
Hi Folks,
A bit of a change of scenery in the dockyard. Now that the colour scheme of the ship has been sorted out and applied, it was time do some serious catch-up with the launch. I decided to paint the inner areas in Raw Sienna. I thought that the Burgundy would be a tad too dark. Also applied some minor changes to the deck by slightly widening the space between planks.

I also shelved the brass gratings and made replicated the shape with spare strips that I had on hand. I was finding it way too difficult to file the brass into the required profile to fit. There was also the challenge of painting / blackening the brass (to be honest, I wasn’t prepared to fork out the expense in purchasing different chemicals to blacken two small pieces of brass). I also included a thicker strip that acts as a step for these deck pieces. This was extremely beneficial in achieving a level fit.

A minor issue was encountered with the curved piece that goes at the bow. The keyway was far too big compared to the keel piece where that attach. Also, during dry runs to check the fitting, I found that this piece was very fiddly to keep in place come time for applying glue. So, I filled the gap with a small wedge and this helped stabilised the bow piece. Once glued into place, a touch-up with paint and you can’t notice the difference.

Now it’s time to return to the main build and crack on with the gun port lining and the gunwales.

Regards, Adam
AdamHall attached the following image(s):
PB261101(640x480).jpg
PB261102 (640x480).jpg
PB261103 (640x480).jpg
PB261104 (640x480).jpg
PB261105 (640x480).jpg
PB261106 (640x480).jpg
PB261107 (640x480).jpg
PB261108 (640x480).jpg
PB261109 (640x480).jpg
PB261110 (640x480).jpg
Gandale
#164 Posted : 12 January 2017 14:43:13

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Very nice piece of work there Adam, I like the modifications you've made to the launch.... well done....Cool Cool

Regards

Alan
AdamHall
#165 Posted : 09 March 2017 14:25:01

Rank: Semi-Pro Level 2
Build-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 17/04/2014
Posts: 99
Points: 303
Location: Perth, Western Australia
Hi Folks,

Issue #40 is finally complete with the installation of the Gunwales and Gun Ports. Some minor variations to the supplied materials as explained below.

Instead of the bamboo for the Gunwales, I used 5 x 1.5mm strips purchased from a hobby shop. I wasn’t too keen on using the bamboo mainly because it has rounded edges. My preference is for the Gunwales to have square edges. This was on top of trying to find suitable strips of bamboo having a flat surface finish along the length without knots. The Gunwales for the bow require a fair degree of bending to ensure that they are sitting flush with the red band as well as have an even contact with the hull for gluing. I tried three times to use the 5 x 1.5mm strips that were supplied in Issue #39 without success. I must say, the strips supplied in Issue #39 are made from some fairly hard wood and for me, not easy to cut with a hobby knife or bend to shape to the hull contour. Each attempt using these strips for the bow Gunwales, resulted in the piece splitting, despite soaking them in water and using an electric plank bender. Probably due to my heavy handed technique. By this time the enjoyment levels were rapidly decreasing. Hence the trip to the hobby shop and change in materials.

To help secure the Gunwales, I cut the strips to approximately 16cm and tacked them into place using map pins. It was easier to work with shorter strips rather than do an entire length. As the map pins left holes in the Gunwales, I used black model railroad track nails (used for HO & N scale).

For the Gun Port frames, used the 3 x 1mm strips that are supplied in Issue #38. In my opinion, the 3mm width provided a finer overall look compared to the recommended 5 x 1.5mm strips supplied in Issue #39.

Now it’s onwards and upwards and commence assembly of the stern gallery.

Cheers. Adam
File Attachment(s):
P3070048 (640x480).jpg (264kb) downloaded 54 time(s).
AdamHall attached the following image(s):
P1100001 (640x480).jpg
P1100006 (640x480).jpg
P1170013 (640x480).jpg
P3070036 (640x480).jpg
P3070037 (640x480).jpg
P3070038 (480x640).jpg
P3070047 (640x480).jpg
P3070049 (480x640).jpg
P3070054 (480x640).jpg
nightwisher
#166 Posted : 09 March 2017 20:55:05

Rank: Vice-Master

Active Service Medal: 500 post active service MedalTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 09/12/2013
Posts: 577
Points: 1,748
Location: smethwick england
Very neat planking, you may have struggled with the gunwales but they ended up looking just as good. Cool
Man he took his time in the sun
Had a dream to understand
A single grain of sand
He gave birth to poetry
But one day will cease to be
Greet the last light of the library...We were here!
Martyn Ingram
#167 Posted : 09 March 2017 21:12:15

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 17/02/2013
Posts: 3,256
Points: 9,844
Location: Kent
BigGrin Lovely work on the gunwales Adam very nicely done Cool

Rgd Martyn
Building ?
Completed. Soliei Royal . Sovereign of the Seas . Virginia . Scotland . San Felipe . Corel vasa , Santisima Trinadad X section , Vasa
Next Build ?
When sailors have good wine, They think themselves in heaven for the time. John Baltharpe
pemberg
#168 Posted : 09 March 2017 21:12:21

Rank: Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 20/04/2012
Posts: 1,787
Points: 5,292
Location: Thurso
Nice job, she's looking good.

Graeme
Gandale
#169 Posted : 10 March 2017 00:24:50

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Your patience has paid off Adam, you're doing a great job with her.....Drool Drool

Regards

Alan
AdamHall
#170 Posted : 05 June 2017 15:06:02

Rank: Semi-Pro Level 2
Build-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 17/04/2014
Posts: 99
Points: 303
Location: Perth, Western Australia
Hi Folks,

Some three months since my last post, however, the shipwrights have been busy working on the gallery. They are pleased to announce that the gallery sections in Issues 41 and 42 is complete. Some minor variations to the instructions to enhance the build.

Added doors to the gallery supports. Basically just strips of sapele, gold painted trim, a brass pin for a door knob and finished off with a door step. Also used 2mm sapele strips for the gallery deck and supports.

Additional strips of ply from die offcuts were placed inside the gallery frame. This was done to provide more surface area for glue when attaching the gallery wall.

For the gallery windows, discarded the supplied brass mesh and used insect screen sprayed with Tamiya Gold Leaf paint. This gave a more realistic window effect. The inner faces of the gallery walls were painted in Burgundy (same colour as the band on the hull). On installation I found that the inner faces are not going to be visible.

On the lower gallery section, an additional wedge (Item 79) was installed to support the bottom strip. I found that there were gaps between the wedges and the hull, So I attached planking offcuts to the wedge and sanded each one to obtain a flush fit.

The lower gallery was finished by using the 5 x 1.5mm strips that were supplied in Issue #39, in lieu of the recommended bamboo. The joint between the lower gallery and the gallery wall was filled with putty.

Now it’s on to the bow and beak platform. Happy building until next time.

Cheers, Adam.
AdamHall attached the following image(s):
P5010001 (480x640).jpg
P5010007 (640x480).jpg
P5070013 (640x480).jpg
P5270019 (640x480).jpg
P5280023 (640x480).jpg
ian smith
#171 Posted : 05 June 2017 15:22:44

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 16/08/2010
Posts: 2,771
Points: 8,344
Location: Brighton
Hi Adam.
Fantastic looking build. very clean. Ian Cool BigGrin
Current builds.Hachettes build the bismark,HMS Victory, HMS Hood.
Finished Builds Corel HMS Victory cross section.
Garth
#172 Posted : 05 June 2017 15:43:06

Rank: Master

Active Service Medal: 500 post active service MedalTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourOutstanding Build: An award for an outstanding build
Groups: Registered

Joined: 29/03/2011
Posts: 1,053
Points: 3,165
Location: Glenvista JHB
Hi Adam,
Awesome build. As Ian mentioned, everything is so clean and crisp - something to aspire to.
Kind regards,
Garth
"Measure twice, cut once!!!"
Finished!!! HMS Victory,
Current build: Black Pearl.
On hold: Bismarck, Golden Hind, Flying Scotsman, Victory Cross Section, SOTS, Tiger 1.
Wish list: USS Constitution.
birdaj2
#173 Posted : 05 June 2017 16:32:17

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 31/05/2010
Posts: 5,679
Points: 17,011
Location: Wiltshire
A beautiful build you have on the go there Adam.

Everything looks so neat and precise a really impressive model.
Happy Modelling

BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower
SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette)
COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
AdamHall
#174 Posted : 15 June 2017 15:15:47

Rank: Semi-Pro Level 2
Build-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 17/04/2014
Posts: 99
Points: 303
Location: Perth, Western Australia
G’day Again,

Thanks for looking in and providing comments. Had some additional spare time available to crack on with the build. Decided to plank the bow deck with sapele as I did not have any matching paint / stain that was anywhere close to a match. Most of this area will be hidden detail that will be covered by the beak platform, but I thought the planked bow deck just finished this area off nicely.

The bow bulkhead was fairly straight forward. Careful examination of the bamboo strips is required to select sections that are smooth and without lumps or bumps. The beak platform has been assembled and planked with sapele. This has the added bonus of providing additional strength to the joints, as well as complimenting the overall finished appearance. The section of excess sapele where the bowspit dowel is inserted will be removed when the grating is completed.

There is a problem with the alignment of the beak platform with the beak frames. I have a huge air gap with the first frame (36) of some 2.5mm that tapers to a flush joint at the last frame (41). Yet the overall alignment is dead straight when checked with a steel ruler. I don’t really want to bend the beak platform, I don’t think that this will be possible once the grating in installed. I could spend considerable time with great care to reduce the height of the fwd most frames (39 to 41) but this will have the risk of snapping something. There needs to be some faring of the frames on the sides to enable the bowsprit beak side panels, but I’d prefer to minimise the amount of work in this area. I’m thinking of placing planking strips on the top of the frames and use these as shims to minimise the gap. Any words of advice on this aspect will be appreciated.

Happy building.
Regards,
Adam
AdamHall attached the following image(s):
P6060036 (640x480).jpg
P6060038 (640x480).jpg
P6080050 (640x480).jpg
P6080052 (640x480).jpg
P6080054 (480x640).jpg
P6150057 (480x640).jpg
P6150059 (640x480).jpg
Markwarren
#175 Posted : 15 June 2017 16:15:54

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Administrators, Global Forum Support, Moderator, Forum Support Team, Official Builds

Joined: 04/01/2016
Posts: 6,464
Points: 19,706
Location: Northamptonshire, England
This is going to Be an awesome model when finished.Drool

Mark
Gandale
#176 Posted : 15 June 2017 20:02:17

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Hi Adam, she's looking great and all credit to you....Drool Drool .. As for the beak frames, I faired the frames until I got the required fit rather than raise the height of the frames....Cool Cool

http://forum.model-space...sts&t=5013&p=78

Regards

Alan
AdamHall
#177 Posted : 10 July 2017 14:33:17

Rank: Semi-Pro Level 2
Build-Diary Medal: Build-Diary Medal of Honour
Groups: Registered

Joined: 17/04/2014
Posts: 99
Points: 303
Location: Perth, Western Australia
Hi Folks,

Just a quick update on progress with the beak platform area. I had a long hard think about resolving the gap that I have between the platform and frames 36 to 38. Thanks Alan for your suggestion on fairing the frames. I attempted to sand down the fwd most frames (39 to 41) but I found that the bowsprit was flexing sideways in the process. In the end I decided to shim the gaps with planking offcuts. The frames are now running level with the base of the bow bulkhead.

I skipped ahead a step and assembled the grates to the beak platform. This was mainly to assess whether the frames that I shimmed would impact on the mounting of the completed platform. So far, so good, as all of the assembled components dry fit together rather snug.

The quality of the supplied grating pieces isn’t exactly ideal. The spacing between the notches in the joists are irregular and many pieces were tapered. Thankfully, there are more than enough joist pieces that are supplied and not all were used (about 18 left over).

Great care and attention is required not to apply too much pressure when cutting the gratings with a mitre saw in order to avoid splitting the area being cut. I ended up switching to using a photo etch saw to cut the smaller grating pieces. The teeth on the photo etch saw are finer resulting in a smooth cut, but the blade is prone to bending if not careful.

So, gratings are assembled and complete. I need to go back and paint the bow bulkhead and beak black, attach the beak platform and then tackle the installation of the side panels.

Thanks for looking in.
Cheers, Adam
AdamHall attached the following image(s):
P7090002 (640x480).jpg
P7090003 (640x480).jpg
P7090009 (480x640).jpg
P7090010 (640x480).jpg
jase
#178 Posted : 10 July 2017 14:55:38

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 21/03/2010
Posts: 7,582
Points: 21,739
looking very neat and tidy

Jase
“Whenever you find yourself on the side of the majority, it is time to pause and reflect.”
-Mark Twain
birdaj2
#179 Posted : 10 July 2017 18:29:45

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered

Joined: 31/05/2010
Posts: 5,679
Points: 17,011
Location: Wiltshire
Really neat work and a great result on solvong that gap problem.

Your build looks fantastic.
Happy Modelling

BUILDING: Hachette Spitfire Mk 1A, Constructo Mayflower
SUBSCRIPTION COMPLETE (Awaiting building): USS Constitution, Sovereign of the Seas, 1:200 Bismarck (Hachette)
COMPLETED: Porsche 911, E-Type Jaguar, Lam Countach
Gandale
#180 Posted : 10 July 2017 22:52:35

Rank: Super-Elite

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionOutstanding Build: An award for an outstanding buildBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Global Forum Support, Moderator, Official Builds, Administrators

Joined: 08/09/2012
Posts: 15,172
Points: 46,151
Location: Aberdeen
Great work Adam, looks the biz.....Drool Drool

Regards

Alan
Users browsing this topic
Guest (3)
12 Pages «<7891011>»
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 0.339 seconds.
DeAgostini