Well, as a build diary this needs to start with an excuse as I'm already quite a way through the "year" / build ... but I suppose better late than never!
The attached pic (hope it shows up!) is of the main assembly progress to date; the front forks, wheel, handlebars etc are also assembled but out of shot.
This is (mostly) up to and including stage 61.
I got the full kit: a couple of problems so far, and a diversion from the recommended order.
- a defective headlight wiring "loom" was quickly replaced by Customer Services; they are good.
- the "engine cables A and B" (stage 52) all (yes, all four ...!!) broke / snapped at the join of the hollow cable with the solid part, when bent into position. Simple gluing didn't work, so I resorted to hand-drilling a pilot hole into each fixing and using a stub of copper core to glue-join the hollow cables back to the fitting. OK so far.
- having read ahead in the instructions, I was concerned at the directions to join and then separate the main frame halves three (?) times ... concerned in case of stripping screw heads / threads / etc in such large and fundamental parts.
I felt that by "working ahead" I could join the frame halves only once, after all the other steps are completed in advance: this has worked for me I hope (!), having got to this point with everything "in" and no parts left over ...
The last item still to fit at this point is the transmission case cover, which has left the drive sprocket exposed for tensioning the chain, with the cover itself able to be fitted last with all the other parts in place.
Looking forward to finishing the beast ...
PhilM attached the following image(s):