Welcome Guest Search | Active Topics | Log In | Register

International Space Station Official Build - Pack 13 Options
delboy271155
#1 Posted : 27 February 2025 23:01:30
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

Here we are at the start of a new pack, with Issue 63. Cool

Parts supplied.....Pic 1, you will also need the final assembly and the BASE 1 from Issue 62.

Start with the final assembly from issue 62 and place the new part 26T as shown in Pic 2. Now hold the parts together and secure them with 4 x MS4 screws as shown in Pic 3.

Position the two BASE 1 parts together and fix them using 2 x Nuts/Bolts as in Pic 4. That`s all for this update, Pic 5.

Regards
delboy271155
(Derek) Admin
delboy271155 attached the following image(s):
63 (1).jpg
63 (2).jpg
63 (3).jpg
63 (4).jpg
63 (5).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#2 Posted : 01 March 2025 15:03:19
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

I`m back with the update for Issue 64 of the ISS, which covers the start of the next double solar panel.

Parts supplied.....Pic 1.

Carefully press the solar panel 3J onto the mounting bar 3A as shown in Pic 2. Then place the part 3E over the solar panel and fix it in place using 2 x MS4 screws, Pic 3.

Finally, press the part WIRE 1 into position as indicated in Pic 4.

That`s all for this update, Pic 5.

Regards
delboy271155
(Derek) Admin
delboy271155 attached the following image(s):
64 (1).jpg
64 (2).jpg
64 (3).jpg
64 (4).jpg
64 (5).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#3 Posted : 03 March 2025 17:39:55
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

The next update for the ISS is here, with issue 65.

Parts supplied.....Pic 1, you will also need the assembly from the end of the last update.

With the previous assembly on the table, add the solar panel 3F as shown in Pic 2.

Then add the retaining piece 3D and secure the parts together using 2 x MS4 screws, Pic 3. The central spar 3C can be added now as in Pic 4, but it will not be fixed in position until the next issue.

Regards
delboy271155
(Derek) Admin
delboy271155 attached the following image(s):
65 (1).jpg
65 (2).jpg
65 (3).jpg
65 (4).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#4 Posted : 06 March 2025 15:50:18
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

I`m back with update #66.

Parts supplied.....Pic 1, you will also need the solar panel from the previous update.

Take parts 3B and 3G and fix them together using an MS4 screw as shown in Pic 2.

Retrieve the assembly from issue 65 and insert the new centre/end bar as shown in Pic 3. NOTE: Be very careful, when pressing the foil panels onto the studs of the end bar. To keep the foil panels in place, add the end caps 3H and 3i, fixing them with 4 x MS4 screws as in Pic 4.

Finally, add the MB7 screw into the end spindle to tension the foil panels, Pic 5. DO NOT over tension the foils, or damage will occur.

Regards
delboy271155
(Derek)
Admin
delboy271155 attached the following image(s):
66 (1).jpg
66 (2).jpg
66 (3).jpg
66 (4).jpg
66 (5).jpg
66 (6).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#5 Posted : 11 March 2025 13:24:41
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

Here`s the next update for the ISS with Issue 67.

In this issue we connect the completed solar panel to the main spar and add some fittings to the base extension.

Parts supplied.....Pic 1, you will also need the base and spar assemblies from issue 63 and the solar panel from issue 66.

Start by positioning the solar panel into the support 26Fbis as shown in Pic 2. Then, put the spar assembly from issue 63 on the table and lay the parts into place as indicated in Pic 3.

At this point there is a printed instruction error. The assembled parts you have on the table are fixed by only 4 screws, not 6. So use 2 x MS9 screws and 2 x MS4 screws as shown in Pic 4. To finish this part of the update, press fit the four corner pins of part 26G into the centre spar, Pic 5.

You now need the base assembly from issue 63 on the table. Fit the connector parts, BASE 2 and BASE 11 and secure them with 3 x BIG AS8 screws as in Pic 6. Your base assembly should be as shown in Pic 7, with Pic 8 showing the end of this issue.

Regards
delboy271155
(Derek) Admin
delboy271155 attached the following image(s):
67 (1).jpg
67 (2).jpg
67 (3).jpg
67 (4).jpg
67 (5).jpg
67 (6).jpg
67 (7).jpg
67 (8).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






delboy271155
#6 Posted : 12 March 2025 17:58:28
Rank: Administration

Publisher Medal: Featured Build of the MonthActive Service Medal: 500 post active service MedalPurple Medal: Super active service medal for 1000 postsTurquoise Medal: Turquoise Medal for model making know-how contributionBuild-Diary Medal: Build-Diary Medal of HonourRed Medal: Red Medal
Groups: Registered, Forum Support Team, Administrators, Global Forum Support Team, Moderator, Official Builds

Joined: 09/11/2012
Posts: 8,364
Points: 24,183
Location: East midlands
Hi All, BigGrin

Here we are with the last update for this pack, issue 68.

Parts supplied.....Pic 1, you will also need the base and solar panel from the previous update.

We start this update with the base assembly from the last update and add the 3 x BASE 12 parts as shown in Pic 2.

Now, with the solar panel assembly, press the part 26U into place as shown in Pic 3.

That`s all for this update. Pics 4 and 5 show how the assemblies should look now.

Regards
delboy271155
(Derek) Admin
delboy271155 attached the following image(s):
68 (1).jpg
68 (2).jpg
68 (3).jpg
68 (4).jpg
68 (5).jpg
COME BACK GUY FAWKES "YOUR COUNTRY NEEDS YOU"






Users browsing this topic
Guest
Forum Jump  
You cannot post new topics in this forum.
You cannot reply to topics in this forum.
You cannot delete your posts in this forum.
You cannot edit your posts in this forum.
You cannot create polls in this forum.
You cannot vote in polls in this forum.

Powered by YAF | YAF © 2003-2009, Yet Another Forum.NET
This page was generated in 1.747 seconds.
DeAgostini