|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 19 contains Stages 60 - 62 Stage 60 - The base frame Parts supplied: Base frame 8, Posts x 4, Oil tank sticker, Shims and Screws Also required: Base frame parts from Stages 52, 54, 55, 56, 57, 58 and 59. Got a bit over zealous and built the base forgetting to take any pictures so as it's similar to that of the Suzuki Hayabusa although slightly smaller I've cheated a bit and used the same set of pictures. bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 61 - The rear suspension Parts supplied: Kick-starter pedal rubber and Lifting handle. Also required: Main frame assembly (Stage 59), Swingarm assembly (Stage 57), Shock absorbers (Stage 31), Threded pins (Stages 22 and 23), Chain cover (Stage 57), Pivot shaft (Stage 57), Nut (Stage 57), Washers (Stages 32 and 49) and Screws (Stages 22, 23 and 57). bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 62 - The display base speaker Parts supplied: Speaker Also required: Display base frame (Stage 60), Posts (Stage 60) and Screws (Stage 60). bugsec attached the following image(s):
|
|
 Rank: Super-Elite       Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Great progress Graham, at this rate you will soon have it finished Al
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Thanks Al. Hoping to finish over the next couple of weeks but with her indoors wanting to decorate  I'll need ta wait and see.
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 20 contains Stages 63 - 65 Stage 63 - The control box Parts supplied: Control box Nothing to build with this stage. bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 64 - The control panel Parts supplied: Control panel, Cable 47A, Cable 47B x 2 and Cable 52A Also required: Ignition key (Stage 16) and Main frame (Stage 61). I have already repaired the cables that are replaced here so have decided for the moment any way to leave well alone. bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 65 - The display base controls. Parts supplied: Control panel cover, Control panel holder, Volume control knob and Screws. Also required: Dispaly base (Stage 62), Control box (Stage 63), Control panel (Stage 64) and Screws (Stage 60). bugsec attached the following image(s):
|
|
|
Nice work graham, she's coming along beautifully.... Regards Alan
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 21 contains Stages 66 - 69 Stage 66 - The battery cover. Parts supplied: Fuel tank base, Battery cover, Left side badge and Screws Also required: Fuel tank (Stage 1), Control board (Stage 59), Main frame (Stage 64) and Screws (Stage 59). bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 67 - The oil tank Parts supplied: Oil tank cover, Oil tank A, Oil tank B, Oil tank cap, Right side badge and Screwa Also required: Mail frame (Stage 66) and Oil tank sticker (Stage 60). bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 68 - The fuel tank cap Parts supplied: Fuel tank cap, Fuel tank cap holder, Fuel tank cap check, Fuel tank cap pin and Screws Also required: Main frame (Stage 67) bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 69 - The left handlebar end Parts supplied: Left handlebar end, Grip, Grip plug and Screws bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 22 contains Stages 70 - 72 Stage 70 - The front brake lever Parts supplied: Front brake lever assembly, Front brake lever clamp and Screws Also required: Front fork assembly (Stage 10) bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 71 - The oil hose and twistgrip Parts supplied: Right handle bar end, Oil hose, Grip plug, Twistgrip and Screws Also required: Main frame (Stage 68), Left handlebar end assembly (Stage 69) and Front fork assembly (Stage 70) bugsec attached the following image(s):
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Stage 72 - Fitting the front fork assembly Parts supplied: Speedometer cable, Steering stem and nut, Brake hose and Black adhesive tape Also required: Main frame (Stage 71) and Front fork assembly (Stage 71) bugsec attached the following image(s):
|
|
 Rank: Pro Groups: New Members, Unapproved Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
that looks fantastic, it really stands out.
|
|
 Rank: Super-Elite       Groups: Registered
Joined: 19/06/2013 Posts: 4,588 Points: 13,553 Location: West Yorkshire
|
Looking great Graham  on the home straight now. Al
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
|
|
 Rank: Pro   Groups: Registered
Joined: 04/06/2010 Posts: 332 Points: 1,000 Location: Bannockburn
|
Pack 23 contains Stages 73 - 76 Stage 73 - Test the electronics, fit the side stand and footrests Parts supplied: Side stand pivot, Side stand, Side stand spring, Footrest rubbers x 2, Footrests x 2 and Screws bugsec attached the following image(s):
|
|
Guest
|