|
Rank: Administration  Groups: Administrator, Administrators, Forum Support Team, Global Forum Support, Global Forum Support Team, Moderator, Official Builds Joined: 24/08/2009 Posts: 1,928 Points: 5,796 Location: UK
|
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
More Stern and Forward deck details added Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Outboard prop shafts fitted, though at this stage the shafts are only temp installed. File Attachment(s): Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
The Funnel build Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
The build of the display stand, I added pins into the pillar tops which wil secure the underside of the hull to the display stand. File Attachment(s): Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Aft range finder radar and tower build Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Assembly of bases for the superstructure, simple enough though filing and filling are needed. Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
More superstructure Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Gun bases added to the superstructure bases Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Vent detail added, which are sandwhiched items comprising of a wood base, PE mesh and PE grille. Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
More gun mounts added Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Start of the Tower build, though it won't be secured in place until all its detail has been added, the base plate is supplied later in the series and is needed to raise its height. Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Guns, straight forward enough and many of... Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Aft gun mount assembly, as before the vents are layered photo-etch brass. Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Forward gun mount assembly and photo-etch vents Tomick attached the following image(s):
|
|
 Rank: Pro Groups: Joined: 24/08/2009 Posts: 48,827 Points: -13,348
|
Guns - lots of them! Tomick attached the following image(s):
|
|
Guest
|