Stage 17: The Port main landing gear.
Stage 17 Contains: Port main landing gear, Port main landing gear suspension, Mounting bracket, Suspension lower link, Suspension upper link, Suspension spring, 2x DM screws, 2x JM screws, 3x DP screws, 3x EP screws, 2x CM screws.
Again, we have two sets of almost identical stages, so care needs to be taken to note the correct stage within the Pack. The way to do this is to identify the upper and lower suspension links. These are stamped with 'L' and 'R'. Once these are identified, you are ready to proceed (see photo 2).
Retrieve the assemblies from Stages 15 and 16. Secure the lower link to the wheel axle with a DP screw, noting the orientation of the part (the other end bends slightly to the right). Attach the upper link to the lower link with an EP screw.
Insert the shock absorber spring into the main landing gear support, and then push the axle rod into the support and onto the spring. Secure the upper link to the support with a DP screw. Fix the mounting bracket to the support with an EP screw with the indent on the same side as the tyre. Place the end of the mainwheel hydraulics shaft into the bracket, and secure with a JM screw ( the screw coming through from the tyre side).
Insert the end of the support into the port landing gear wall, placing the end of the support into the socket and secure with a DM screw. Using a CM screw, secure the hydraulic pivot to the end of the landing gear wall. Check that the landing gear can move both away and towards the wall.
This completes Stage 17. Store any unused or leftover parts in a stage-labelled bag for future use.
CaptnBirdseye attached the following image(s):